Abatement Desk

Your crew shouldn't be waiting on paperwork.

More than half of Wisconsin abatement jobs start within a day of the earliest date the law allows. There's no slack, so whatever time you spend getting the notification in pushes the job back.

We fill out every notification and keep track of what's due, so it can go in the day you get the job.

Get early access

We'll email you once, the day it opens.

Wisconsin is the only state we cover right now. If you file somewhere else, pick it anyway and we'll know where to go next.

We already have your jobs.

Your notifications are public record, so we pulled them in before you signed up. Tell us which ones are yours and you're set up.

  1. Crew can start In 12 working days
    Job 1400 Mineral St. demolition, two structures
    To do File within 2 working days every field complete
  2. Crew can start In 15 working days
    Job Cedar Street Apartments floor tile, units 1–8
    To do File within 5 working days draft, four fields left
  3. Crew can start In 11 working days
    Job Riverside Elementary boiler room, 480 lin ft
    To do Revise asbestos up 26%
  4. Crew can start In 10 working days
    Job 212 N. Water St. pipe insulation, 3,200 sq ft
    To do Nothing due filed today
  5. Crew can start In 7 working days
    Job County Hwy J garage roofing, 1,150 sq ft
    To do Nothing due filed 3 working days ago

This is an example. We made up the addresses, but the dates follow the ten-working-day rule.

All your jobs in one list

Getting the same answer out of ARDN means a login, an MFA code, a search, and five tabs, for every job you want to check.

Everybody works off the same job

You're all looking at the same record, whether that's two people or ten. A document gets uploaded once and it's there for everyone. Unlimited users on every plan.

We check it before you file

We check your dates against the rule before anything goes in. If the asbestos amount moves by 20% or more, or the start date changes, we tell you it needs a revision.

Nothing gets written over

Revise in ARDN and it writes over what was there, so last month's version is gone. We hold on to all of them, with the footages that were on each one.

Nothing goes to the state until you send it.

We get the notification ready and we watch the deadline. You submit it in ARDN, same as you do now.

It sits alongside whatever you use for jobs and crews.

Pricing

Two ways to pay, and we put you on the cheaper one.

What each plan costs and what it includes
Per notification $69/mo + $5 a month per notification Unlimited $699/mo
First month free Included Included
Unlimited users Included Included
Unlimited revisions & lifetime storage Included Included
Automatic deadline checks Included Included
Notifications $5 a month each Unlimited
20 a year: $169 a month Cheaper above 126 a year

The schedule above is all of it. We put you on the cheaper plan, and we count again every twelve months.

$69 a month is less than the state charges you to file one notification. Half of them run $400 or more, and the top band is $1,325.

What the rules say

Every date and dollar figure on this page comes out of the state's own rules.

The ten days start when you file

Notification filed Today
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
Crew can start 10 working days later

Counted from today. Weekends don't count toward the ten, but holidays do.

The citations
Ten working days
You have to file at least ten working days before work begins. A working day is Monday through Friday, and holidays count. NR 447.07(1), (3)(a); NR 447.02(43)
Changing the start date
Change the start date and that's a revision. The code is specific about it:
In no event may an operation … begin on a date other than the date contained in the written notice of the new start date.
NR 447.07(3)(d)
What the state charges
Wisconsin charges $135 to $1,325 for the notification itself. That's NR 410.05(2)'s permit-exemption-review fee plus NR 410.05(3)'s inspection fee, in the bands printed on form 4500-113. NR 410.05(2), (3); form 4500-113
The $100 nobody has been charged
NR 410.05(4) adds $100 when the asbestos amount changes by 20% or more. We have not found one that was charged it. The 427 revisions that did carry a fee ran from $35 to $1,325, and the middle one was $300. NR 410.05(4)
If you get it wrong
Federal civil penalties run to $124,426 a day, per violation, and EPA comes after the contractor as well as the owner. 42 U.S.C. 7413(b); 40 CFR 19.4, Table 1, for penalties assessed on or after 8 January 2025

Every rule on this page, with its citation

Get early access.

We'll email you the day it opens, and your jobs will already be in there.

Get early access